|

|
Ruey-Shan Andy Guo
Professor
Department of Business Administration
National
Taiwan University
|
-
No.1, Sec. 4, Roosevelt
Road
-
Department of Business
Administration
-
National Taiwan University
-
Taipei, Taiwan
|
Tel:
+886-23366-1050
Fax: +886-22362-5379
rsguo@ntu.edu.tw |
|
|
Ruey-Shan
Andy Guo
received his Ph.D. degree in Mechanical Engineering with a major in
manufacturing and a minor in solid state physics from Massachusetts
Institute of Technology in 1991. From 1991 to 1995, he was a research
engineer at National Semiconductor, Santa Clara, CA, USA, where he
worked in the areas of process control, factory operations, and
computer-integrated manufacturing. He also obtained his MBA degree
from San Jose State University in 1994.
Since
1995, he has been with National Taiwan University. He is currently
Professor in both Graduate Institute of Business Administration and
Graduate Institute of Industrial Engineering. During his current
position, he has been a principal investigator or co-PI to many
industry and institution funded projects (such as TSMC, National
Science Council, and Industrial Technology Research Institute in
Taiwan, and Semiconductor Research Corp. in USA) in the areas of advanced process control, yield improvement,
computer-integrated manufacturing, and foundry supply chain
management. He has published more than 80 journal and
conference papers in these areas.
Dr.
Guo teaches undergraduate and graduate courses in quality control,
experimental design, operations management, and supply chain
management. He won Excellent Teaching Award three times from National Taiwan
University in 2000, 2001 and 2005 and the best journal paper award from the
Chinese Management Association in 1999.
Dr.
Guo is an IEEE member and is currently the Associate Editor of IEEE
Transactions on Semiconductor Manufacturing.
He has participated in the
program committee of International Symposium of Semiconductor
Manufacturing from 1997 to now.
|
|
|
 | Advanced
Process Control
|
 | Quality
Engineering
|
 | Data
Mining
|
 | Supply
Chain Management
|
|
|
| MBA |
- 1994/10
|
- San Jose State university, USA
|
| Ph.D. |
- 1991/9
|
- Massachusetts Institute of
Technology, USA
- Major: Mechanical engineering
- Minor: Semiconductor devices and
processes
|
| M.S. |
- 1987/6
|
- Massachusetts Institute of
Technology, USA
- Major: Civil engineering
|
| B.S. |
- 1983/6
|
National Taiwan University,
Taiwan
Major: Civil engineering
|
|
|
| 2002/8 -
now |
National Taiwan University,
Department of Business Administration
- Professor
|
| 1995/2 -
2002/7 |
- National Taiwan University,
Department of Business Administration
Associate Professor
|
| 1991/11 - 1995/2 |
- National Semiconductor,
Fairchild Research Center, CA, USA
Senior Process Engineer
|
| 1987/6 - 1991/11 |
- Massachusetts Institute of
Technology, MA, USA
Laboratory for
Manufacturing and Productivity
Laboratory for Microsystems
Research Assistant
|
| 1985/9 - 1987/6 |
- Massachusetts Institute of
Technology, MA, USA
Laboratory for Intelligent
Systems
Research Assistant
|
| 1983/9 - 1985/8 |
- Department of Logistics,
Taiwan Military Service
Surveying Engineer
|
|
|
|
|
 | Production and Operations Management
(Ph.D., MBA, undergraduate level) |
 | Quality Management (MBA, Undergraduate
level) |
 | Advanced Quality Control (MS level) |
 | Design
of Experiments (MBA, Undergraduate
level) |
 | Multivariate Analysis (MBA, Undergraduate
level) |
 | IC Fabrication Processes (Undergraduate
level) |
 | Enterprise Resource Planning (MBA,
Undergraduate level) |
 | E-Business &
Supply Chain Management (MBA,
Undergraduate level) |
|
|
|
2007/8 – 2009/7 |
Stochastic Modeling and Empirical Validation of Customers’
Inter-purchase Time
Sponsor:
National Science Council of Taiwan |
|
2006/11 – 2007/10 |
Research on Inter-firm Engineering and Business Processes
between Foundry and Fabless
Sponsor:
Taiwan Semiconductor Manufacturing Corporation |
|
2006/11 – 2007/10 |
Model Value-delivery Mechanism between Foundry and Fabless
Sponsor:
Taiwan Semiconductor Manufacturing Corporation |
| 2006/8
- 2009/7 |
Echelon
Inventory Collaboration Mechanism of Semiconductor Supply Chains
with Advanced Information
Sponsor:
National Science Council of
Taiwan |
| 2005/8
- 2007/7 |
Available-to-Promise
Allocation Mechanism with
Consideration of Common Components
Sponsor:
National Science Council of
Taiwan |
|
2005/1
- 2005/12 |
Research
on customer value analysis and on-line consumer behavior
analysis
Sponsor:
Eastern
Shopping |
|
2004/8
- 2005/7
|
Stochastic
Modeling of Customer Value Analysis
Sponsor:
National
Science Council of Taiwan |
|
2004/8
- 2007/7
|
Monitoring
and Control of Semiconductor Supply Chains with RFID-based
Information
Sponsor:
National
Science Council of Taiwan |
|
2004/8
- 2005/7
|
The
Integrated Demand-Capacity Planning Model in Supply Chain
Network for Semiconductor Manufacturing
Sponsor:
National
Science Council of Taiwan
|
|
2004/8
- 2006/7
|
Configuration,
Monitoring and Control of Semiconductor Supply Chains
Sponsor:
Semiconductor
Research Corporation, USA |
|
2003/8
- 2004/7
|
Coordinated
Multi-plant Production Planning in a Multi-echelon Production
Environment
Sponsor:
National
Science Council of Taiwan |
|
2003/8
- 2004/7
|
Quality
and Price Competition in the Duopoly Supply Chain Structure
Sponsor:
National
Science Council of Taiwan
|
|
2003/4
- 2003/12
|
Research
on Semiconductor E-manufacturing and E-diagnostics
Sponsor:
Industrial
Technology Research Institute
|
|
2002/8
- 2003/7
|
Supply-Demand
Coordination Mechanism and Model for Supply Chain Management
Sponsor:
National
Science Council of Taiwan
|
|
2002/8
- 2003/7
|
The
Application of Statistics and Data Mining Techniques to
Improving Semiconductor Manufacturing Yield
Sponsor:
National
Science Council of Taiwan
|
|
2002/4
- 2002/12
|
Research
on Semiconductor Advanced Process Control
Sponsor:
Industrial
Technology Research Institute
|
|
2001/8
- 2002/7
|
Multiple
Variation Decomposition and Rational Sub-grouping on Modeling
Process Non-uniformity
Sponsor:
National
Science Council of Taiwan
|
|
2001/1
- 2003/12
|
Demand
Data Mining and Planning in Semiconductor Manufacturing Networks
Sponsor:
Semiconductor
Research Corporation, USA
|
|
2000/8
- 2001/7
|
The
Enhanced Abnormal Shift Detection of Wafer Acceptance Test Data
Sponsor:
National
Science Council of Taiwan
|
|
2000/1
- 2001/6
|
Research
on Developing SCM Tools
Sponsor:
AsiaTek
Inc
|
|
2000/1
- 2000/4
|
Evaluation
of Factory Planning and Scheduling Software Packages
Sponsor:
Taiwan
Semiconductor Manufacturing Corporation
|
|
1999/2
- 2000/8
|
Self-tuning
Run-by-Run Process Control Schemes for Semiconductor
Manufacturing
Sponsor:
National
Science Council of Taiwan
|
|
1998/8
- 2000/8
|
Semiconductor
Equipment Monitoring and Preventive Maintenance
Sponsor:
National
Science Council of Taiwan
|
|
1998/8
- 2001/8
|
Integrated
Inspection and Control for Semiconductor Cluster Tools
Sponsor:
National
Science Council of Taiwan
|
|
1998/8
- 1999/8
|
Advanced
Run-by-Run Process Control Schemes for Semiconductor
Manufacturing
Sponsor:
National
Science Council of Taiwan
|
|
1996/2
- 1999/1
|
Development
of Integrated Manufacturing System For IC Fabrication
Sponsors:
National
Science Council of Taiwan
Taiwan
Semiconductor Manufacturing Corporation
Vanguard
International Semiconductor Corporation
|
|
1997/8
- 1998/8
|
The
Application of EWMA Control Charts to Wafer Acceptance Test
Sponsor:
National
Science Council of Taiwan
|
|
1996/8
- 1997/8
|
Integrated
Wafer Acceptance Test Schemes and Intelligent Diagnosis
Sponsor:
National
Science Council of Taiwan
|
|
1996/7
- 1996/11
|
Abnormal
Trend Detection in End-of-Line Wafer Acceptance Test
Sponsor:
Taiwan
Semiconductor Manufacturing Corporation
|
|
1996/1
- 1996/5
|
Construction
Material Price Index Survey
Sponsor:
Department
of Public Construction of Taiwan
|
|
1995/10
- 1996/5
|
Business
Ethics Research
Sponsor:
Taiwan
Management Academic Society
|
|
1995/9
- 1996/3
|
End-of-line
Warning System for Wafer Acceptance Test Data
Sponsor:
Taiwan
Semiconductor Manufacturing Corporation
|
|
|
|
|
001.
|
E.
Sachs, R. Guo, S. Ha, and A. Hu, 1991 May, “Process
Control System for VLSI Fabrication,” IEEE Transactions on
Semiconductor Manufacturing, vol. 4, no. 2, pp. 134-144.
|
|
002.
|
R.
Guo and E. Sachs, 1993 February, “Modeling, Optimization
and Control of Spatial Uniformity in Manufacturing
Processes,” IEEE Transactions on Semiconductor
Manufacturing, vol. 6, no. 1, pp. 41-57.
|
|
003.
|
A.
Chen, R. Guo, A. Yang, and C. Tseng, 1998 December, “An
Integrated Approach to Semiconductor Equipment
Monitoring,” Journal of Chinese Society of Mechanical
Engineers, vol. 19, no. 6, pp.581-591.
|
|
004.
|
R.
Guo, A. Chen, and K. Wu, 1999 March “An
Enhanced Algorithm to Integrate Statistical Process Control
and Feedback Control”
Journal of Management, vol. 16, no. 1, pp. 101-124.
|
|
005.
|
R.
Guo, J. Chen, A. Chen, and S. Lu, 1999 September “A
Self-Tuning Run-by-Run Process Controller for Processes
subject to Random Disturbances,” Journal of the Chinese
Institute of Engineers, vol. 22, no. 5, pp. 627-638.
|
|
006.
|
C.
Min, R. Guo, S. Chang, and J. Wei, 2000 August “SHEWMA: an
End-of-line SPC Scheme Using Wafer Acceptance Test Data,”
IEEE Transactions on Semiconductor Manufacturing, vol. 13,
no. 3, pp. 344-357.
|
|
007.
|
A.
Chen, R. Guo, and P. Yeh, 2000 September “An Effective SPC
Approach to Monitoring Semiconductor Manufacturing Processes
with Multiple Variation Sources,” Chinese Statistical
Journal, vol. 38, no. 3, pp. 269-280.
|
|
008.
|
A.
Chen and R. Guo, 2001 February “Age-based Double EWMA
Controller and its Application to CMP Process,” IEEE
Transactions on Semiconductor Manufacturing, vol. 14, no. 1,
pp. 11-19.
|
|
009.
|
R.
Guo and J. Chen, 2002 June “An EWMA-Based Process Mean
Estimator with Dynamic Tuning Capability,” IIE
Transactions on Quality and Reliability Engineering, vol.
34, no. 6, pp. 573-582.
|
|
010.
|
R.
Guo, D. Chiang, W. Liu, and C. Liu, 2002 December “Supply-Demand
Coordination Mechanism and Modeling for Supply Chain
Management,”
National Taiwan University Management Review, vol. 13, no.
1, pp. 1-30.
|
|
011.
|
R.
Guo, D. Chiang, and H. Chen,
2004 October “Stochastic Modeling and Validation of
Customer Value Analysis,” Journal
of Management,
vol.
21, no. 5, pp. 675-692.
|
|
012.
|
R.
Guo, D. Chiang, Y. Chen,
and J. Liou,
2004 December “Decision Support Models for Multi-plant
Production Planning,”
National
Taiwan University Management Review,
vol.
15, no. 1, pp. 49-74.
|
|
013.
|
Y.
Su, R. Guo, and S. Chang, 2005 January “Virtual Fab:
Enabling Framework and Dynamic Manufacturing Service
Provisioning Mechanism,” Information and Management, vol.
42, no.2, pp.
329-348.
|
| 014. |
R.
Guo, D. Chiang, J. Tsai, and F. Pai, 2005 June “The use of
Tailored Postponement to Allocate Production Quantity among
Manufacturers,” Bulletin of the
College
of
Engineering
, NTU, No. 94, pp. 29-39. |
| 015. |
D.
Chiang, R. Guo, and W. Lu, 2005 June, “An Optimal
Manufacturing and Remanufacturing Model under Resources
Recycle Mechanisms,” Bulletin of the College of
Engineering, NTU, No. 94, pp. 17-27. |
| 016. |
C. Wang, R. Guo, and D. Chiang, 2006
December “Quality and Price Competition in the Duopoly,”
National Taiwan University Management Review,
vol. 17, no. 1. |
| 017. |
D. Chiang, R. Guo, M. Chen, and F. Bai,
2007 February “Take-or-Pay Supply Chain Contract under
Market Price Volatility,” Journal of Management, vol. 24,
no. 1, pp. 1-16. |
| 018. |
D. Chiang, R. Guo, A. Chen, and M.
Cheng, 2007 February, “Optimal Supply Chain Configurations
in Semiconductor Manufacturing,” International Journal of
Production Research, vol. 45, no. 3, pp.631-651. |
|
019. |
R. Guo, D. Chiang, and F. Pai, 2007
April “Multi-objectives Exception Management Model for
Semiconductor Back-end Environment under Turnkey Service,”
Production Planning and Control, vol. 18, no. 3, pp.203-216. |
|
020. |
R. Guo, D. Chiang, and F. Pai, 2007
August “A WIP-based Exception Management Model for
Integrated Circuit Back-end Production Processes,”
International Journal of Advanced Manufacturing Technology,
vol. 33, no. 11-12, pp. 1263-1274. |
|
021. |
C. Wang, R. Guo, D. Chiang, and J.
Wong, “Decision Tree Based Control Chart Pattern
Recognition,” accepted by International Journal of
Production Research. |
|
022. |
D. Chiang, R. Guo, and F. Pai,
“Improved Customer Satisfaction with a Hybrid Dispatching
Rule in Semiconductor Back-end Factories,” accepted by
International Journal of Production Research. |
|
023. |
R. Guo, D. Chiang, and L. Yang,
“Semiconductor Supply Chain Monitoring and Control Schemes
Using Echelon WIP Inventory” accepted by Journal of
Management. |
|
|
|
|
001.
|
E.
Sachs, R. Guo, S. Ha and A. Hu and K. Wong, 1989 August,
“VLSI Process Control,” SRC Conference on Computer
Integrated Manufacturing, University of Michigan, Ann Arbor.
|
|
002.
|
E.
Sachs, R. Guo, S. Ha and A. Hu, 1989 October, “Process
Control System for VLSI Fabrication,” Fifth Symposium on
Automated IC Manufacturing, Electrochemical Society,
Hollywood, Florida.
|
|
003.
|
E.
Sachs, R. Guo, S. Ha and A. Hu, 1990 October, “Run by Run
Process Control,” International Electronics Manufacturing
Technology Symposium, Washington DC.
|
|
004.
|
R.
Guo and E. Sachs, 1990 October, “Rapid Process
Optimization Using a Run by Run Controller,” Techcon
90‘, San Jose, California.
|
|
005.
|
E.
Sachs and R. Guo, 1990 June, “On-line Process Optimization
and Control Using the Sequential Design of Experiments,”
1990 Symposium on VLSI Technology, Hawaii.
|
|
006.
|
H.
Wang, C. Michael, S. Geha and R. Guo, 1992 December, “An
Optimized Gate Oxide Breakdown Test by Activating Oxide
Traps at Low Fields,” International Electron Device
Meeting, San Francisco, California.
|
|
007.
|
R.
Guo, M. Slama, R. Griffin and K. Holman, 1993 October, “A
Work Cell Manufacturing System for VLSI Fabrication,”
International Electronics Manufacturing Technology
Symposium, San Jose, California.
|
|
008.
|
R.
Griffin, R. Guo, M. Slama and K. Holman, 1993 November,
“Agile Semiconductor Manufacturing System: From Job Shop
to Work Cell,” Government Microcircuit Applications
Conference, New Orleans, Louisiana.
|
|
009.
|
S.
Geha, R. Guo, M. Slama and K. Srikrishna, 1993 May, “A
Methodology for Optimizing Gate Oxide Pre-clean,”
Electrochemical Society, Hawaii.
|
|
010.
|
M.
Slama, R. Guo and S. Geha, 1993 May, “The Use of Qbd as a
Method for Evaluating Gate Oxide Cleaning Splits,”
Electrochemical Society, Hawaii.
|
|
011.
|
R.
Griffin, R. Guo and M. Slama, 1994 June, “Results of an
Implant Masking Integrated Workcell in a Development
Facility,” International Symposium on Semiconductor
Manufacturing, Tokyo, Japan.
|
|
012.
|
R.
Guo, R. Griffin and M. Slama, 1994 June, “Agile Flow
Control in Semiconductor Manufacturing: Simulation and
Animation Demonstration,” International Symposium on
Semiconductor Manufacturing, Tokyo, Japan.
|
|
013.
|
R.
Guo, C. Tsai, J. Lee and S. Chang, 1996 October,
“Intelligent Process Diagnosis Based on End-of-line
Electrical Test Data,” International Electronics
Manufacturing Technology Symposium, Austin, Texas.
|
|
014.
|
R.
Guo, C. Tsai, J. Lee and S. Chang, 1996 October, “Fuzzy
Logic-based Process Diagnosis Using Water Acceptance Test
Data,” Semiconductor Manufacturing Technology Workshop,
Hsinchu, Taiwan.
|
|
015.
|
J.
Fan, R. Guo, S. Chang and J. Lee, 1996 October, “Abnormal
Trend Detection of End-of-line Data Using EWMA Chart,”
Semiconductor Manufacturing Technology Workshop, Hsinchu,
Taiwan.
|
|
016.
|
J.
Fan, R. Guo, S. Chang and J. Lee, 1996 November, “Abnormal
Trend Detection of Sequence-disordered Data Using EWMA
Method,” Advanced Semiconductor Manufacturing Conference
and Workshop, Cambridge, Massachusetts.
|
|
017.
|
R.
Guo and Y. Chu, 1995 May, “Integrated QFD and Taguchi
Robust Quality Engineering,” First National Conference on
Quality Management, Hsinchu, Taiwan.
|
|
018.
|
R.
Guo, C. Tsai, J. Lee and S. Chang, 1996 November,
“Intelligent IC Fabrication Diagnosis System,” Second
National Conference on Quality Management, Taipei,
Taiwan.
|
|
019.
|
J.
Fan, R. Guo, S. Chang and J. Lee, 1996 November,
“End-of-line Quality Control and Abnormal Trend Detection
for IC Fabrication,” Second National Conference on Quality
Management, Taipei, Taiwan.
|
|
020.
|
R.
Guo, S. Chang, J. Fan, and C. Tsai, 1997 March “An
Integrated Wafer Acceptance Test Scheme in Semiconductor
Manufacturing,” Automatic Control Conference, Taipei,
Taiwan.
|
|
021.
|
R.
Guo, J. Chen, S. Wang and L. Huang, 1997 March “An
Adaptive Process Controller for Semiconductor
Manufacturing,” Automatic Control Conference, Taipei,
Taiwan.
|
|
022.
|
W.
Mao, C. Tseng, S. Chang and R. Guo, 1997 March “Design and
Implementation of an Active Furnace Monitoring System in
Semiconductor Manufacturing,” Automatic Control
Conference, Taipei, Taiwan.
|
|
023.
|
C.
Fan, R. Guo and S. Chang, 1997 June “EWMA/SD: An
End-of-line SPC Scheme to Monitor Sequence-Disordered
Data,” Second International Workshop on Statistical
Metrology, Kyoto, Japan
|
|
024.
|
R.
Guo, L. Huang, A. Chen and J. Chen, 1997 October “A
Cost-Effective Methodology for a Run-by-Run EWMA
Controller,” International Symposium on Semiconductor
Manufacturing, San Francisco.
|
|
025.
|
R.
Guo, Y. Su, S. Chang, Y. Lee and T. Chou, 1997 November,
“Real Competitiveness via
Virtual Fab,”Technology
Management Conference,
Kaohsiung,
Taiwan.
|
|
026.
|
A.
Chen, R. Guo and C. Lee, 1998 June “Runs Rules for
Bivariate Shewhart Chart,” Third International Workshop on
Statistical Metrology, Honolulu, Hawaii.
|
|
027.
|
R.
Guo, A. Chen, and C. Tseng, 1998 June, “A Real-time
Equipment Monitoring and Fault Detection System,”
Semiconductor Manufacturing Technology Workshop, Hsinchu,
Taiwan.
|
|
028.
|
Y.
Su, R. Guo and S. Chang, 1998 June, “A Conceptual
Framework for Manufacturing Service Provisioning by Virtual
Fabs,” Semiconductor Manufacturing Technology Workshop,
Hsinchu, Taiwan.
|
|
029.
|
S.
Chang, T. Chou, R. Guo, Y. Su, L. Lu, and I. Lai, 1998 June,
“A Dynamic Binding Model for Service Creation in Virtual
Fab,” Semiconductor Manufacturing Technology Workshop,
Hsinchu, Taiwan.
|
|
030.
|
R.
Guo, J. Chen, and A. Chen, 1998 July, “Self-tuning Process
Control for Processes subject to Random Disturbances,”
International Conference on Automation Technology and
International Conference of Production Research, Taipei,
Taiwan.
|
|
031.
|
Y.
Su, R. Guo, and S. Chang, 1998 July, “Virtual Fab: A New
Business Model for Service-Oriented Foundry Fab,”
International Conference on Automation Technology and
International Conference of Production Research, Taipei,
Taiwan.
|
|
032.
|
R.
Guo, A. Chen, and K. Wu, 1998 July, “An Enhanced Algorithm
to Integrate Statistical Process Monitoring and Feedback
Adjustment,” International Conference on Automation
Technology and International Conference of Production
Research, Taipei, Taiwan.
|
|
033.
|
A.
Chen, R. Guo, and A. Yang, 1998 July, “An Integrated
Approach to Semiconductor Equipment Monitoring,”
International Conference on Automation Technology and
International Conference of Production Research, Taipei,
Taiwan.
|
|
034.
|
R.
Guo, Y. Su, S. Chang, T. Chou, and Y. Lai, 1998 October,
“Manufacturing Service Creation and Management for Next
Generation Virtual Fab,” International Symposium on
Semiconductor Manufacturing, Tokyo, Japan.
|
|
035.
|
J.
Chen, R. Guo, A. Chen, and S. Lu, 1998 October “A
Self-tuning EWMA Controller for Processes subject to Small
and Large Disturbances,” International Symposium on
Semiconductor Manufacturing, Tokyo, Japan.
|
|
036.
|
A.
Chen, R. Guo, and C. Lee, 1998 October, “Statistical
Monitoring of Thickness Data Using Bivariate Runs Rules,”
International Symposium on Semiconductor Manufacturing,
Tokyo, Japan.
|
|
037.
|
C.
Fan, R. Guo, and S. Chang, 1998 October, “An Integrated
Fault Detection Scheme for Wafer Acceptance Test Data,”
International Symposium on Semiconductor Manufacturing,
Tokyo, Japan.
|
|
038.
|
R.
Guo, A. Chen, and J. Chen, 1999 May, “Self-tuning EWMA
Mean Estimate and its Application in R2R Control,”
Industrial Engineering Research Conference, Phoenix,
Arizona.
|
|
039.
|
R.
Guo, A. Chen, A. Lin, and M. Lan, 1999 July, “Modeling,
Optimization and Control of Wafer-level Spatial Uniformity
for Rapid Thermal Oxidation of Silicon Process,”
Automation Technology Conference, Chia-I, Taiwan.
|
|
040.
|
A.
Chen and R. Guo, 1999 July, “Equipment Health Index and
Real-time Monitoring,” Automation Technology Conference,
Chia-I, Taiwan.
|
|
041.
|
S.
Lu, H. Huang, S. Lee, C. Lu, R. Guo, C. Liu, P. Chang, S.
Chang, C. Weng, and A. Chen, 1999 July, “Network Ready
Semiconductor Manufacturing Cluster Tool,” Automation
Technology Conference, Chia-I, Taiwan.
|
|
042.
|
A.
Chen, R. Guo, and G. Wu, 1999 October “Real-time Equipment
Health Evaluation and Prognosis,” 3rd Conference on
Reliability and Maintainability, Kaoshion, Taiwan.
|
|
043.
|
R.
Guo, A. Chen, P. Lin, and Y. Shih, 1999 October,
“Function-Based Cost Modeling for Wafer Manufacturing and
its Application to Strategic Management,” International
Symposium on Semiconductor Manufacturing, Santa Clara, CA.
|
|
044.
|
R.
Guo, A. Chen, C. Liu, A. Lin, and M. Lan, 1999 October,
“Modeling and Optimization of Wafer-level Spatial
Uniformity with the Use of Rational Subgrouping,”
International Symposium on Semiconductor Manufacturing,
Santa Clara, CA.
|
|
045.
|
A.
Chen, R. Guo, Y. Chou, C. Lin, and S. Wu, 1999 October,
“Time-based Run to Run Control of CMP Processes,”
International Symposium on Semiconductor Manufacturing,
Santa Clara, CA.
|
|
046.
|
C.
Fan, S. Chang, R. Guo, J. You, H. Kung, H. Chen, S. Lin, and
J. Wei, 1999 October, “SHEWMAC: an End-of-Line SPC Scheme
for Joint Monitoring of Process Mean and Variance,”
International Symposium on Semiconductor Manufacturing,
Santa Clara, CA.
|
|
047.
|
R.
Guo and A. Chen, 1999 December, “Function Decomposition
and Cost Modeling for Wafer Manufacturing,” Chinese
Institute of Industrial Engineers National Conference,
Hsinchu, Taiwan.
|
|
048
|
A.
Chen, R. Guo, and P. Yeh, 2000 April, “Application of
Multi-level T2 Control Charts to Monitoring Semiconductor
Processes with Multiple Variation Sources,” Probability
and Statistics Annual Conference, Taiwan.
|
|
049.
|
R.
Guo, A. Chen, and J. Chen, 2000 June, “Design of Run to
Run Controller for Processes subject to Deterministic
Drifts,” The 6th International Conference on
Automation Technology, Taipei, Taiwan.
|
|
050.
|
Y.
Su, S. Chang, R. Guo and Y. Lai, 2000 June, “Application
of Dynamic Manufacturing Service Provisioning Mechanism to
Delivery Commitment,” Semiconductor Manufacturing
Technology Workshop, Hsinchu, Taiwan.
|
|
051.
|
C.
Fan, S. Chang, and R. Guo, 2000 June, “SHEWMAC: an
End-of-line SPC Scheme via Exponentially Weighted Moving
Statistics,” Semiconductor Manufacturing Technology
Workshop, Hsinchu, Taiwan.
|
|
051.
|
C.
Fan, S. Chang, and R. Guo, 2000 June, “SHEWMAC: an
End-of-line SPC Scheme via Exponentially Weighted Moving
Statistics,” Semiconductor Manufacturing Technology
Workshop, Hsinchu, Taiwan.
|
|
052.
|
A.
Chen, R. Guo, and P. Yeh, 2000 June, “An Effective SPC
Approach to Monitoring Semiconductor Manufacturing Processes
with Multiple Variation Sources,” Semiconductor
Manufacturing Technology Workshop, Hsinchu, Taiwan.
|
|
053.
|
R.
Guo, A. Chen, and J. Chen, 2000 June, “Run-To-Run Control
Schemes For CMP Process Subject to Deterministic Drifts,”
Semiconductor Manufacturing Technology Workshop, Hsinchu,
Taiwan.
|
|
054.
|
S.
Chang, R. Guo, Y. Su, and Y. Lai, 2000 September,
“Realizing Dynamic Manufacturing Service Provisioning
Mechanism in Order Commitment Service,” International
Symposium on Semiconductor Manufacturing, Tokyo, Japan.
|
|
055.
|
A.
Chen, R. Guo and G. Wu, 2000 September, “Real-time
Equipment Health Evaluation and Dynamic Preventive
Maintenance,” International Symposium on Semiconductor
Manufacturing, Tokyo, Japan.
|
|
056.
|
A.
Chen, R. Guo and P. Lin, 2000 September, “Statistical
Analysis and Design of Semiconductor Manufacturing
Systems,” International Symposium on Semiconductor
Manufacturing, Tokyo, Japan.
|
|
057.
|
A.
Chen, R. Guo and P. Lin, 2000 September, “An
Effective SPC Approach to Monitoring Semiconductor
Manufacturing Processes with Multiple Variation Sources,”
International Symposium on Semiconductor Manufacturing,
Tokyo, Japan.
|
|
058.
|
R.
Guo, C. Fan, A. Chen, K. Hsu, and J. Wei, 2001 October,
“Data Mining and Fault Diagnosis based on Wafer Acceptance
Test Data,” International Symposium on Semiconductor
Manufacturing, San Jose, CA.
|
|
059.
|
A.
Chen, R. Guo, C. Fan, A. Hon, O. Ho, L. Hu, J. Wae, and M.
King, 2002 October “Data
Mining Techniques for Engineering Data Analysis: Issues and
Solutions,” International
Symposium on Semiconductor Manufacturing, Tokyo, Japan.
|
|
060.
|
R.
Guo, D. Chiang, and J. Chen, 2002 December,
“Optimization-based Available-to-Promise Allocation
Model,” The 4th Asia-Pacific Conference on
Industrial Engineering and Management Systems, Taipei,
Taiwan.
|
|
061.
|
D.
Chiang, R. Guo and M. Yu, 2002 December, “A
Component Commonality-based Material Planning Model for the
Assembly Industry,” The 4th Asia-Pacific
Conference on Industrial Engineering and Management Systems,
Taipei, Taiwan.
|
|
062.
|
D.
Chiang, R. Guo and M. Lee, 2002 December, “Using
Decomposition Method to Solve Multi-Plant Production
Planning and Scheduling Problem,” The 4th
Asia-Pacific Conference on Industrial Engineering and
Management Systems, Taipei, Taiwan.
|
|
063.
|
J.
Liu, D. Chiang, and R. Guo, 2002 December, “Coordinated
Multi-plant Production Planning in a Multi-echelon
Production Environment,” The 4th Asia-Pacific
Conference on Industrial Engineering and Management Systems,
Taipei, Taiwan.
|
|
064.
|
C.
Fan, R. Guo, A. Chen, A. Hon, J. Wei, and M. King, 2003
October, “Integrated
Yield Mining Solution with Enhanced Electrical Test Data
Correlation,”
International
Symposium on Semiconductor Manufacturing, San Jose, CA.
|
|
065.
|
Y.
Su, R. Guo, and S. Chang, 2004 September, “Inter-firm
Collaboration Mechanism in Process Development and Product
Design between Foundry and Fabless Design House,” Semiconductor
Manufacturing Technology Workshop, Hsinchu, Taiwan.
|
|
066.
|
R.
Guo, Y. Su, and S. Chang, 2004 September, “Manufacturing
and Engineering Collaboration Mechanism between Foundry and
Fabless,” International
Symposium on Semiconductor Manufacturing, Tokyo, Japan.
|
|
067.
|
R.
Guo, Y. Su, and S. Chang, 2004 December, “Collaborative
Engineering Mechanism between IC Design House and
Foundry,” The
5th Asia-Pacific Conference on Industrial
Engineering and Management Systems, Gold Coast, Australia.
|
|
068.
|
Y.
Su, R. Guo, and W. Hsieh, 2004 December, “Research
on Business Model of
Silicon
Intellectual Property Providers,”
Technology Management Conference, Taipei, Taiwan.
|
|
069.
|
Y.
Su, R. Guo, and W. Hsieh, 2004 December, "Patterns of
Business Model Shift: A Historical Study on the SIP
Providers," Innovation & Management Conference,
Taipei, Taiwan.
|
|
070.
|
Y.
Su, R. Guo, and Y. Chang, 2004 December, “Inter-firm
Horizontal Collaboration Model for Total Solution Service
Provision: Case Study on the Partnership of SIP Providers in
the IC Design Industry,” Innovation & Management
Conference, Taipei, Taiwan.
|
|
071.
|
Y. Su, R. Guo, and Y. Chang, 2005 June, “Patterns of Horizontal Collaboration for Total
Solution Service Provision in the IC Design Industry,” Tenth
Annual Meeting of the Asia Pacific Decision Sciences
Institute,
Taipei
,
Taiwan
. |
|
072.
|
Y. Su, R. Guo, and S. Chang, 2005 July, “Inter-firm Collaboration
Mechanism for Process-Product Innovation between Foundry and
Fabless Design House,”
Portland
International
Center
for Management of Engineering and Technology Conference,
Portland
,
Oregon
. |
|
073.
|
Y. Su, R. Guo, and W. Hsieh, 2005 July, “Historically Explore on the
Patterns of Business Model for Silicon Intellectual Property Providers in the
Semiconductor Industry,”
Portland
International
Center
for Management of Engineering and Technology Conference,
Portland
,
Oregon
. |
|
074.
|
Y. Su, R. Guo, and C. Hsiao, 2005 September,
“Patterns of Vertical Engineering Collaboration between
Foundry and Design Service Provider,” International
Symposium on Semiconductor Manufacturing,
San Jose
,
CA
. |
|
075.
|
D. Chiang, R. Guo, A. Chen, 2005 October, “Robust
Supply Chain Configurations in Semiconductor
Manufacturing,” International Conference on Modeling and
Analysis of Semiconductor Manufacturing,
Suntec City
,
Singapore
. |
|
076.
|
R.
Guo, D. Chiang, F. Pai, and C. Tsao, 2005 December, “Retailer’s Ordering Policy: The Tradeoff between Emergent Replenishment
and Backup Agreement,” The 6th Asia-Pacific Conference on
Industrial Engineering and Management Systems,
Manila
,
Philippines
. |
|
077.
|
D.
Chiang, R. Guo, F. Pai, and K. Chen, 2005 December,
“Optimal Ordering Policy by Considering the Tradeoff
between Discount Vendor and Emergency Vendor,”
The 6th
Asia-Pacific Conference on Industrial Engineering and
Management Systems,
Manila
,
Philippines
. |
|
078.
|
J.
Liou, D.
Chiang, and R. Guo, 2005 December, “Supply
Chain Production Planning Problem with Occupied Material,”
The 6th Asia-Pacific Conference on Industrial Engineering
and Management Systems,
Manila
,
Philippines
.
|
|
079.
|
D.
Chiang, R. Guo, J. Liou, and H. Lee, 2005 December, “Coordinated Multi-plant Production Planning in a Multi-echelon Production
Environment Considering
Alternative Route
,” The 6th
Asia-Pacific Conference on Industrial Engineering and
Management Systems,
Manila
,
Philippines
. |
| 080. |
R.
Guo, D. Chiang, K. Chuang, L. Yang, and J. Liou, 2005
December, “Semiconductor
Supply Chain Monitoring Schemes for Echelon WIP
Inventory,” Chinese Industrial Engineering Conference, Hsinchu,
Taiwan. |
| 081. |
D.
Chiang, R. Guo, A. Chen, M. Cheng, C. Chen, and P. Chung, 2005
December, “Optimal
Supply Chain Configurations in Semiconductor Manufacturing,”
Chinese Industrial Engineering Conference, Hsinchu,
Taiwan. |
| 082. |
R.
Guo, D. Chiang, L. Yang, and K. Chuang, 2006 September, “Supply
Chain Inventory Control in Semiconductor Manufacturing,” International
Symposium on Semiconductor Manufacturing,
Tokyo
,
Japan
. |
| 083. |
D.
Chiang, R. Guo, A. Chen, and C. Chen, 2006 September, “A
Quadratic Goal Programming Model and Sensitivity Analysis
for Semiconductor Supply Chain,” International
Symposium on Semiconductor Manufacturing,
Tokyo
,
Japan
.
|
| 084. |
Y.
Su, R. Guo, and H. Chang, 2006 September, “Evolutionary
Engineering Collaboration for DFM/DFY Solutions between
Foundry and EDA Tools Vendors: A Preliminary Exploration,”
International
Symposium on Semiconductor Manufacturing,
Tokyo
,
Japan
.
|
| 085. |
R.
Guo, D. Chiang, H. Lo, and F. Pai, 2006 December, “The
Design of Supply Chain Contract in Consideration of Risk
Pooling and Risk Sharing,” The
7th Asia-Pacific Conference on Industrial
Engineering and Management Systems,
Bangkok
,
Thailand
.
|
| 086. |
R.
Guo, D. Chiang, and L. Yang, 2006
December, “Monitoring
Semiconductor Supply Chain based on Echelon WIP Inventory
and CONWIP System,”
The
7th Asia-Pacific Conference on Industrial
Engineering and Management Systems, Bangkok, Thailand.
|
| 087. |
D.
Chiang, R. Guo, M. Chen, and F. Pai, 2006
December, “Take-or-Pay
Supply Chain Contract under Market Price Volatility,”
The
7th Asia-Pacific Conference on Industrial
Engineering and Management Systems,
Bangkok
,
Thailand
.
|
| 088. |
D.
Chiang, R. Guo, A. Chen, and C. Chen, 2006
December, “Sensitivity
Analysis of a Quadratic Goal Programming Model for
Semiconductor Supply Chain,”
The
7th Asia-Pacific Conference on Industrial
Engineering and Management Systems,
Bangkok
,
Thailand
.
|
|
089. |
R. Guo, D. Chiang, and L. Yang, 2006
December, “Semiconductor Supply Chain Monitoring Schemes for
Echelon WIP Inventory Using CONWIP Concept,” Chinese
Industrial Engineering Conference, Tai-Chung, Taiwan. |
|
090. |
D. Chiang, R. Guo, A. Chen, and C.
Chen, 2006 December, “Sensitivity Analysis of a Quadratic
Goal Programming Model for Semiconductor Supply Chain,”
Chinese Industrial Engineering Conference, Tai-Chung,
Taiwan. |
|
091. |
R. Guo and D. Chiang, 2007 June,
“Monitoring and Control of Echelon Inventory in
Semiconductor Manufacturing,” International Conference on
Operations and Supply Chain Management, Xina, China. |
|
092. |
F. Pai, D. Chiang, and R. Guo, 2007
August, “Customer Satisfaction Improvement with a Hybrid
Dispatching Rule in Semiconductor Back-end Factories,” 2007
Annual meeting of Academy of Management, Philadelphia,
Pennsylvania. |
|
093. |
R. Guo, Y. Su, S. Chiu, F. Pai and C.
Yeh, 2007 October, “Evolutionary Business Models and
Inter-Firm Engineering Processes between the Foundry and
Fabless in the Semiconductor Industry,” International
Symposium on Semiconductor Manufacturing, San Jose, CA. |
|
094. |
R. Guo, D. Chiang, H. Lin, and M. Guo,
2007 October, “Forward Echelon-based Inventory Monitoring in
Semiconductor Supply Chain,” International Symposium on
Semiconductor Manufacturing, San Jose, CA. |
|
095. |
R. Guo, D. Chiang, Y. Chen, and
J. Chen, 2007 December, “Stochastic Modeling and Validation
of Inter-purchase Time for Customer Relationship
Management,” The 8th Asia-Pacific Conference on
Industrial Engineering and Management Systems, Kaohsiung,
Taiwan. |
|
096. |
R. Guo, Y. Su, S. Chiu, and F. Pai,
2007 December, “Inter-firm Engineering Processes and
Business Models between Foundry and Fabless in Semiconductor
Industry,” The 8th Asia-Pacific Conference on
Industrial Engineering and Management Systems, Kaohsiung,
Taiwan. |
|
097. |
F. Pai, R. Guo, and D. Chiang, 2007
December, “Cooperative Buyer-Vendor Relationships for Custom
Integrated Circuits Manufacturing,” The 8th
Asia-Pacific Conference on Industrial Engineering and
Management Systems, Kaohsiung, Taiwan. |
|
|
|
| 001. |
Production and Operations
Management, 1997 October, Open University of Taiwan |
| 002. |
Chapter
17 & 19 in Run-to-Run
Control in Semiconductor Manufacturing, 2000 October,CRC
Press |
| 003. |
Production and Operations
Management
Cases,
2002 October, Yuan-Liou Publishing |
|
|
Last Update :
2008/12/16 |