Ruey-Shan Andy Guo

Professor

Department of Business Administration

National Taiwan University 

No.1, Sec. 4, Roosevelt Road

Department of Business Administration

National Taiwan University

Taipei, Taiwan

Tel: +886-23366-1050

Fax: +886-22362-5379

rsguo@ntu.edu.tw

Biography

Ruey-Shan Andy Guo received his Ph.D. degree in Mechanical Engineering with a major in manufacturing and a minor in solid state physics from Massachusetts Institute of Technology in 1991. From 1991 to 1995, he was a research engineer at National Semiconductor, Santa Clara, CA, USA, where he worked in the areas of process control, factory operations, and computer-integrated manufacturing. He also obtained his MBA degree from San Jose State University in 1994.

Since 1995, he has been with National Taiwan University. He is currently Professor in both Graduate Institute of Business Administration and Graduate Institute of Industrial Engineering. During his current position, he has been a principal investigator or co-PI to many industry and institution funded projects (such as TSMC, National Science Council, and Industrial Technology Research Institute in Taiwan, and Semiconductor Research Corp. in USA) in the areas of advanced process control, yield improvement, computer-integrated manufacturing, and foundry supply chain management. He has published more than 80 journal and conference papers in these areas.

Dr. Guo teaches undergraduate and graduate courses in quality control, experimental design, operations management, and supply chain management. He won Excellent Teaching Award three times from National Taiwan University in 2000, 2001 and 2005 and the best journal paper award from the Chinese Management Association in 1999.

Dr. Guo is an IEEE member and is currently the Associate Editor of IEEE Transactions on Semiconductor Manufacturing. He has participated in the program committee of International Symposium of Semiconductor Manufacturing from 1997 to now.

Research Interests

bulletAdvanced Process Control
bulletQuality Engineering
bulletData Mining
bulletSupply Chain Management

Education

MBA
1994/10
San Jose State university, USA
Ph.D.
1991/9
Massachusetts Institute of Technology, USA
Major: Mechanical engineering
Minor: Semiconductor devices and processes
M.S.
1987/6
Massachusetts Institute of Technology, USA
Major: Civil engineering
B.S.
1983/6
National Taiwan University, Taiwan
Major: Civil engineering

 

Professional Employment

2002/8 - now
National Taiwan University, Department of Business Administration 
Professor
1995/2 - 2002/7
National Taiwan University, Department of Business Administration
Associate Professor
1991/11 - 1995/2
National Semiconductor, Fairchild Research Center, CA, USA
Senior Process Engineer
1987/6 - 1991/11
Massachusetts Institute of Technology, MA, USA
Laboratory for Manufacturing and Productivity
Laboratory for Microsystems
Research Assistant
1985/9 - 1987/6
Massachusetts Institute of Technology, MA, USA
Laboratory for Intelligent Systems
Research Assistant
1983/9 - 1985/8
Department of Logistics, Taiwan Military Service
Surveying Engineer

 

Teaching Areas

bulletProduction and Operations Management (Ph.D., MBA, undergraduate level)
bulletQuality Management (MBA, Undergraduate level)
bulletAdvanced Quality Control (MS level)
bulletDesign of Experiments (MBA, Undergraduate level)
bulletMultivariate Analysis (MBA, Undergraduate level)
bulletIC Fabrication Processes (Undergraduate level)
bulletEnterprise Resource Planning (MBA, Undergraduate level)
bulletE-Business & Supply Chain Management (MBA, Undergraduate level)

 

Research Projects

2007/8 – 2009/7

Stochastic Modeling and Empirical Validation of Customers’ Inter-purchase Time

Sponsor:

National Science Council of Taiwan

2006/11 – 2007/10

Research on Inter-firm Engineering and Business Processes between Foundry and Fabless

Sponsor:

Taiwan Semiconductor Manufacturing Corporation

2006/11 – 2007/10

Model Value-delivery Mechanism between Foundry and Fabless

Sponsor:

Taiwan Semiconductor Manufacturing Corporation

2006/8 - 2009/7

Echelon Inventory Collaboration Mechanism of Semiconductor Supply Chains with Advanced Information

Sponsor:

National Science Council of Taiwan

2005/8 - 2007/7

Available-to-Promise Allocation Mechanism with Consideration of Common Components

Sponsor:

National Science Council of Taiwan

2005/1 - 2005/12

Research on customer value analysis and on-line consumer behavior analysis

Sponsor:

Eastern Shopping

2004/8 - 2005/7  

Stochastic Modeling of Customer Value Analysis

Sponsor:

National Science Council of Taiwan

2004/8 - 2007/7  

 

Monitoring and Control of Semiconductor Supply Chains with RFID-based Information

Sponsor:

National Science Council of Taiwan

2004/8 - 2005/7  

The Integrated Demand-Capacity Planning Model in Supply Chain Network for Semiconductor Manufacturing

Sponsor:

National Science Council of Taiwan

2004/8 - 2006/7  

Configuration, Monitoring and Control of Semiconductor Supply Chains

Sponsor:

Semiconductor Research Corporation, USA

2003/8 - 2004/7

Coordinated Multi-plant Production Planning in a Multi-echelon Production Environment

Sponsor:

National Science Council of Taiwan

2003/8 - 2004/7

Quality and Price Competition in the Duopoly Supply Chain Structure

Sponsor:

National Science Council of Taiwan

2003/4 - 2003/12 

Research on Semiconductor E-manufacturing and E-diagnostics

Sponsor:

Industrial Technology Research Institute

2002/8 - 2003/7

Supply-Demand Coordination Mechanism and Model for Supply Chain Management

Sponsor:

National Science Council of Taiwan

2002/8 - 2003/7

The Application of Statistics and Data Mining Techniques to Improving Semiconductor Manufacturing Yield

Sponsor:

National Science Council of Taiwan

2002/4 - 2002/12

Research on Semiconductor Advanced Process Control

Sponsor:

Industrial Technology Research Institute  

2001/8 - 2002/7

Multiple Variation Decomposition and Rational Sub-grouping on Modeling Process Non-uniformity

Sponsor:

National Science Council of Taiwan

2001/1 - 2003/12

Demand Data Mining and Planning in Semiconductor Manufacturing Networks

Sponsor:

Semiconductor Research Corporation, USA  

2000/8 - 2001/7

The Enhanced Abnormal Shift Detection of Wafer Acceptance Test Data

Sponsor:

National Science Council of Taiwan  

2000/1 - 2001/6

Research on Developing SCM Tools

Sponsor:

AsiaTek Inc  

2000/1 - 2000/4

Evaluation of Factory Planning and Scheduling Software Packages

Sponsor:

Taiwan Semiconductor Manufacturing Corporation  

1999/2 - 2000/8

Self-tuning Run-by-Run Process Control Schemes for Semiconductor Manufacturing

Sponsor:

National Science Council of Taiwan 

1998/8 - 2000/8

Semiconductor Equipment Monitoring and Preventive Maintenance

Sponsor:

National Science Council of Taiwan 

1998/8 - 2001/8

Integrated Inspection and Control for Semiconductor Cluster Tools

Sponsor:

National Science Council of Taiwan 

1998/8 - 1999/8

Advanced Run-by-Run Process Control Schemes for Semiconductor Manufacturing

Sponsor:

National Science Council of Taiwan 

  1996/2 - 1999/1

Development of Integrated Manufacturing System For IC Fabrication

Sponsors:

National Science Council of Taiwan

Taiwan Semiconductor Manufacturing Corporation

Vanguard International Semiconductor Corporation 

1997/8 - 1998/8

The Application of EWMA Control Charts to Wafer Acceptance Test

Sponsor:

National Science Council of Taiwan 

1996/8 - 1997/8

Integrated Wafer Acceptance Test Schemes and Intelligent Diagnosis

Sponsor:

National Science Council of Taiwan

1996/7 - 1996/11

Abnormal Trend Detection in End-of-Line Wafer Acceptance Test

Sponsor:

Taiwan Semiconductor Manufacturing Corporation 

1996/1 - 1996/5

Construction Material Price Index Survey

Sponsor:

Department of Public Construction of Taiwan

1995/10 - 1996/5

Business Ethics Research

Sponsor:

Taiwan Management Academic Society

1995/9 - 1996/3

End-of-line Warning System for Wafer Acceptance Test Data

Sponsor:

Taiwan Semiconductor Manufacturing Corporation

 

Publications

A. Journals Papers

001.

E. Sachs, R. Guo, S. Ha, and A. Hu, 1991 May, “Process Control System for VLSI Fabrication,” IEEE Transactions on Semiconductor Manufacturing, vol. 4, no. 2, pp. 134-144.

002.

R. Guo and E. Sachs, 1993 February, “Modeling, Optimization and Control of Spatial Uniformity in Manufacturing Processes,” IEEE Transactions on Semiconductor Manufacturing, vol. 6, no. 1, pp. 41-57.

003.

A. Chen, R. Guo, A. Yang, and C. Tseng, 1998 December, “An Integrated Approach to Semiconductor Equipment Monitoring,” Journal of Chinese Society of Mechanical Engineers, vol. 19, no. 6, pp.581-591.

004.

R. Guo, A. Chen, and K. Wu, 1999 March “An Enhanced Algorithm to Integrate Statistical Process Control and Feedback Control” Journal of Management, vol. 16, no. 1, pp. 101-124.

005.

R. Guo, J. Chen, A. Chen, and S. Lu, 1999 September “A Self-Tuning Run-by-Run Process Controller for Processes subject to Random Disturbances,” Journal of the Chinese Institute of Engineers, vol. 22, no. 5, pp. 627-638.

006.

C. Min, R. Guo, S. Chang, and J. Wei, 2000 August “SHEWMA: an End-of-line SPC Scheme Using Wafer Acceptance Test Data,” IEEE Transactions on Semiconductor Manufacturing, vol. 13, no. 3, pp. 344-357.

007.

A. Chen, R. Guo, and P. Yeh, 2000 September “An Effective SPC Approach to Monitoring Semiconductor Manufacturing Processes with Multiple Variation Sources,” Chinese Statistical Journal, vol. 38, no. 3, pp. 269-280.

008.

A. Chen and R. Guo, 2001 February “Age-based Double EWMA Controller and its Application to CMP Process,” IEEE Transactions on Semiconductor Manufacturing, vol. 14, no. 1, pp. 11-19.

009.

R. Guo and J. Chen, 2002 June “An EWMA-Based Process Mean Estimator with Dynamic Tuning Capability,” IIE Transactions on Quality and Reliability Engineering, vol. 34, no. 6, pp. 573-582.

010.

R. Guo, D. Chiang, W. Liu, and C. Liu, 2002 December “Supply-Demand Coordination Mechanism and Modeling for Supply Chain Management,” National Taiwan University Management Review, vol. 13, no. 1, pp. 1-30.

011.

R. Guo, D. Chiang, and H. Chen, 2004 October “Stochastic Modeling and Validation of Customer Value Analysis,” Journal of Management, vol. 21, no. 5, pp. 675-692.

012.

R. Guo, D. Chiang, Y. Chen, and J. Liou, 2004 December “Decision Support Models for Multi-plant Production Planning,” National Taiwan University Management Review, vol. 15, no. 1, pp. 49-74.
013. Y. Su, R. Guo, and S. Chang, 2005 January “Virtual Fab: Enabling Framework and Dynamic Manufacturing Service Provisioning Mechanism,” Information and Management, vol. 42, no.2, pp. 329-348.
014. R. Guo, D. Chiang, J. Tsai, and F. Pai, 2005 June “The use of Tailored Postponement to Allocate Production Quantity among Manufacturers,” Bulletin of the College of Engineering , NTU, No. 94, pp. 29-39.
015. D. Chiang, R. Guo, and W. Lu, 2005 June, “An Optimal Manufacturing and Remanufacturing Model under Resources Recycle Mechanisms,” Bulletin of the College of Engineering, NTU, No. 94, pp. 17-27.
016. C. Wang, R. Guo, and D. Chiang, 2006 December “Quality and Price Competition in the Duopoly,” National Taiwan University Management Review, vol. 17, no. 1.
017. D. Chiang, R. Guo, M. Chen, and F. Bai, 2007 February “Take-or-Pay Supply Chain Contract under Market Price Volatility,” Journal of Management, vol. 24, no. 1, pp. 1-16.
018. D. Chiang, R. Guo, A. Chen, and M. Cheng, 2007 February, “Optimal Supply Chain Configurations in Semiconductor Manufacturing,” International Journal of Production Research, vol. 45, no. 3, pp.631-651.
019. R. Guo, D. Chiang, and F. Pai, 2007 April “Multi-objectives Exception Management Model for Semiconductor Back-end Environment under Turnkey Service,” Production Planning and Control, vol. 18, no. 3, pp.203-216.
020. R. Guo, D. Chiang, and F. Pai, 2007 August “A WIP-based Exception Management Model for Integrated Circuit Back-end Production Processes,” International Journal of Advanced Manufacturing Technology, vol. 33, no. 11-12, pp. 1263-1274.
021. C. Wang, R. Guo, D. Chiang, and J. Wong, “Decision Tree Based Control Chart Pattern Recognition,” accepted by International Journal of Production Research.
022. D. Chiang, R. Guo, and F. Pai, “Improved Customer Satisfaction with a Hybrid Dispatching Rule in Semiconductor Back-end Factories,” accepted by International Journal of Production Research.
023. R. Guo, D. Chiang, and L. Yang, “Semiconductor Supply Chain Monitoring and Control Schemes Using Echelon WIP Inventory” accepted by Journal of Management.

B. Conference Papers

001.

E. Sachs, R. Guo, S. Ha and A. Hu and K. Wong, 1989 August, “VLSI Process Control,” SRC Conference on Computer Integrated Manufacturing, University of Michigan, Ann Arbor.

002.

E. Sachs, R. Guo, S. Ha and A. Hu, 1989 October, “Process Control System for VLSI Fabrication,” Fifth Symposium on Automated IC Manufacturing, Electrochemical Society, Hollywood, Florida.

003.

E. Sachs, R. Guo, S. Ha and A. Hu, 1990 October, “Run by Run Process Control,” International Electronics Manufacturing Technology Symposium, Washington DC.

004.

R. Guo and E. Sachs, 1990 October, “Rapid Process Optimization Using a Run by Run Controller,” Techcon 90‘, San Jose, California.

005.

E. Sachs and R. Guo, 1990 June, “On-line Process Optimization and Control Using the Sequential Design of Experiments,” 1990 Symposium on VLSI Technology, Hawaii.

006.

H. Wang, C. Michael, S. Geha and R. Guo, 1992 December, “An Optimized Gate Oxide Breakdown Test by Activating Oxide Traps at Low Fields,” International Electron Device Meeting, San Francisco, California.

007.

R. Guo, M. Slama, R. Griffin and K. Holman, 1993 October, “A Work Cell Manufacturing System for VLSI Fabrication,” International Electronics Manufacturing Technology Symposium, San Jose, California.

008.

R. Griffin, R. Guo, M. Slama and K. Holman, 1993 November, “Agile Semiconductor Manufacturing System: From Job Shop to Work Cell,” Government Microcircuit Applications Conference, New Orleans, Louisiana.

009.

S. Geha, R. Guo, M. Slama and K. Srikrishna, 1993 May, “A Methodology for Optimizing Gate Oxide Pre-clean,” Electrochemical Society, Hawaii.

010.

M. Slama, R. Guo and S. Geha, 1993 May, “The Use of Qbd as a Method for Evaluating Gate Oxide Cleaning Splits,” Electrochemical Society, Hawaii.

011.

R. Griffin, R. Guo and M. Slama, 1994 June, “Results of an Implant Masking Integrated Workcell in a Development Facility,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

012.

R. Guo, R. Griffin and M. Slama, 1994 June, “Agile Flow Control in Semiconductor Manufacturing: Simulation and Animation Demonstration,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

013.

R. Guo, C. Tsai, J. Lee and S. Chang, 1996 October, “Intelligent Process Diagnosis Based on End-of-line Electrical Test Data,” International Electronics Manufacturing Technology Symposium, Austin, Texas.

014.

R. Guo, C. Tsai, J. Lee and S. Chang, 1996 October, “Fuzzy Logic-based Process Diagnosis Using Water Acceptance Test Data,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

015.

J. Fan, R. Guo, S. Chang and J. Lee, 1996 October, “Abnormal Trend Detection of End-of-line Data Using EWMA Chart,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

016.

J. Fan, R. Guo, S. Chang and J. Lee, 1996 November, “Abnormal Trend Detection of Sequence-disordered Data Using EWMA Method,” Advanced Semiconductor Manufacturing Conference and Workshop, Cambridge, Massachusetts.

017.

R. Guo and Y. Chu, 1995 May, “Integrated QFD and Taguchi Robust Quality Engineering,” First National Conference on Quality Management, Hsinchu, Taiwan.

018.

R. Guo, C. Tsai, J. Lee and S. Chang, 1996 November, “Intelligent IC Fabrication Diagnosis System,” Second National Conference on Quality Management, Taipei, Taiwan.

019.

J. Fan, R. Guo, S. Chang and J. Lee, 1996 November, “End-of-line Quality Control and Abnormal Trend Detection for IC Fabrication,” Second National Conference on Quality Management, Taipei, Taiwan.

020.

R. Guo, S. Chang, J. Fan, and C. Tsai, 1997 March “An Integrated Wafer Acceptance Test Scheme in Semiconductor Manufacturing,” Automatic Control Conference, Taipei, Taiwan.

021.

R. Guo, J. Chen, S. Wang and L. Huang, 1997 March “An Adaptive Process Controller for Semiconductor Manufacturing,” Automatic Control Conference, Taipei, Taiwan.

022.

W. Mao, C. Tseng, S. Chang and R. Guo, 1997 March “Design and Implementation of an Active Furnace Monitoring System in Semiconductor Manufacturing,” Automatic Control Conference, Taipei, Taiwan.

023.

C. Fan, R. Guo and S. Chang, 1997 June “EWMA/SD: An End-of-line SPC Scheme to Monitor Sequence-Disordered Data,” Second International Workshop on Statistical Metrology, Kyoto, Japan

024.

R. Guo, L. Huang, A. Chen and J. Chen, 1997 October “A Cost-Effective Methodology for a Run-by-Run EWMA Controller,” International Symposium on Semiconductor Manufacturing, San Francisco.

025.

R. Guo, Y. Su, S. Chang, Y. Lee and T. Chou, 1997 November, “Real Competitiveness via Virtual Fab,”Technology Management Conference,  Kaohsiung, Taiwan.

026.

A. Chen, R. Guo and C. Lee, 1998 June “Runs Rules for Bivariate Shewhart Chart,” Third International Workshop on Statistical Metrology, Honolulu, Hawaii.

027.

R. Guo, A. Chen, and C. Tseng, 1998 June, “A Real-time Equipment Monitoring and Fault Detection System,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

028.

Y. Su, R. Guo and S. Chang, 1998 June, “A Conceptual Framework for Manufacturing Service Provisioning by Virtual Fabs,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

029.

S. Chang, T. Chou, R. Guo, Y. Su, L. Lu, and I. Lai, 1998 June, “A Dynamic Binding Model for Service Creation in Virtual Fab,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

030.

R. Guo, J. Chen, and A. Chen, 1998 July, “Self-tuning Process Control for Processes subject to Random Disturbances,” International Conference on Automation Technology and International Conference of Production Research, Taipei, Taiwan.

031.

Y. Su, R. Guo, and S. Chang, 1998 July, “Virtual Fab: A New Business Model for Service-Oriented Foundry Fab,” International Conference on Automation Technology and International Conference of Production Research, Taipei, Taiwan.

032.

R. Guo, A. Chen, and K. Wu, 1998 July, “An Enhanced Algorithm to Integrate Statistical Process Monitoring and Feedback Adjustment,” International Conference on Automation Technology and International Conference of Production Research, Taipei, Taiwan.

033.

A. Chen, R. Guo, and A. Yang, 1998 July, “An Integrated Approach to Semiconductor Equipment Monitoring,” International Conference on Automation Technology and International Conference of Production Research, Taipei, Taiwan.

034.

R. Guo, Y. Su, S. Chang, T. Chou, and Y. Lai, 1998 October, “Manufacturing Service Creation and Management for Next Generation Virtual Fab,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

035.

J. Chen, R. Guo, A. Chen, and S. Lu, 1998 October “A Self-tuning EWMA Controller for Processes subject to Small and Large Disturbances,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

036.

A. Chen, R. Guo, and C. Lee, 1998 October, “Statistical Monitoring of Thickness Data Using Bivariate Runs Rules,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

037.

C. Fan, R. Guo, and S. Chang, 1998 October, “An Integrated Fault Detection Scheme for Wafer Acceptance Test Data,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

038.

R. Guo, A. Chen, and J. Chen, 1999 May, “Self-tuning EWMA Mean Estimate and its Application in R2R Control,” Industrial Engineering Research Conference, Phoenix, Arizona.

039.

R. Guo, A. Chen, A. Lin, and M. Lan, 1999 July, “Modeling, Optimization and Control of Wafer-level Spatial Uniformity for Rapid Thermal Oxidation of Silicon Process,” Automation Technology Conference, Chia-I, Taiwan.

040.

A. Chen and R. Guo, 1999 July, “Equipment Health Index and Real-time Monitoring,” Automation Technology Conference, Chia-I, Taiwan.

041.

S. Lu, H. Huang, S. Lee, C. Lu, R. Guo, C. Liu, P. Chang, S. Chang, C. Weng, and A. Chen, 1999 July, “Network Ready Semiconductor Manufacturing Cluster Tool,” Automation Technology Conference, Chia-I, Taiwan.

042.

A. Chen, R. Guo, and G. Wu, 1999 October “Real-time Equipment Health Evaluation and Prognosis,” 3rd Conference on Reliability and Maintainability, Kaoshion, Taiwan.

043.

R. Guo, A. Chen, P. Lin, and Y. Shih, 1999 October, “Function-Based Cost Modeling for Wafer Manufacturing and its Application to Strategic Management,” International Symposium on Semiconductor Manufacturing, Santa Clara, CA.

044.

R. Guo, A. Chen, C. Liu, A. Lin, and M. Lan, 1999 October, “Modeling and Optimization of Wafer-level Spatial Uniformity with the Use of Rational Subgrouping,” International Symposium on Semiconductor Manufacturing, Santa Clara, CA.

045.

A. Chen, R. Guo, Y. Chou, C. Lin, and S. Wu, 1999 October, “Time-based Run to Run Control of CMP Processes,” International Symposium on Semiconductor Manufacturing, Santa Clara, CA.

046.

C. Fan, S. Chang, R. Guo, J. You, H. Kung, H. Chen, S. Lin, and J. Wei, 1999 October, “SHEWMAC: an End-of-Line SPC Scheme for Joint Monitoring of Process Mean and Variance,” International Symposium on Semiconductor Manufacturing, Santa Clara, CA.

047.

R. Guo and A. Chen, 1999 December, “Function Decomposition and Cost Modeling for Wafer Manufacturing,” Chinese Institute of Industrial Engineers National Conference, Hsinchu, Taiwan.

048

A. Chen, R. Guo, and P. Yeh, 2000 April, “Application of Multi-level T2 Control Charts to Monitoring Semiconductor Processes with Multiple Variation Sources,” Probability and Statistics Annual Conference, Taiwan.

049.

R. Guo, A. Chen, and J. Chen, 2000 June, “Design of Run to Run Controller for Processes subject to Deterministic Drifts,” The 6th International Conference on Automation Technology, Taipei, Taiwan.

050.

Y. Su, S. Chang, R. Guo and Y. Lai, 2000 June, “Application of Dynamic Manufacturing Service Provisioning Mechanism to Delivery Commitment,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

051.

C. Fan, S. Chang, and R. Guo, 2000 June, “SHEWMAC: an End-of-line SPC Scheme via Exponentially Weighted Moving Statistics,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

051.

C. Fan, S. Chang, and R. Guo, 2000 June, “SHEWMAC: an End-of-line SPC Scheme via Exponentially Weighted Moving Statistics,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

052.

A. Chen, R. Guo, and P. Yeh, 2000 June, “An Effective SPC Approach to Monitoring Semiconductor Manufacturing Processes with Multiple Variation Sources,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

053.

R. Guo, A. Chen, and J. Chen, 2000 June, “Run-To-Run Control Schemes For CMP Process Subject to Deterministic Drifts,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.

054.

S. Chang, R. Guo, Y. Su, and Y. Lai, 2000 September, “Realizing Dynamic Manufacturing Service Provisioning Mechanism in Order Commitment Service,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

055.

A. Chen, R. Guo and G. Wu, 2000 September, “Real-time Equipment Health Evaluation and Dynamic Preventive Maintenance,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

056.

A. Chen, R. Guo and P. Lin, 2000 September, “Statistical Analysis and Design of Semiconductor Manufacturing Systems,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

057.

A. Chen, R. Guo and P. Lin, 2000 September, “An Effective SPC Approach to Monitoring Semiconductor Manufacturing Processes with Multiple Variation Sources,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

058.

R. Guo, C. Fan, A. Chen, K. Hsu, and J. Wei, 2001 October, “Data Mining and Fault Diagnosis based on Wafer Acceptance Test Data,” International Symposium on Semiconductor Manufacturing, San Jose, CA.

059.

A. Chen, R. Guo, C. Fan, A. Hon, O. Ho, L. Hu, J. Wae, and M. King, 2002 October “Data Mining Techniques for Engineering Data Analysis: Issues and Solutions,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.

060.

R. Guo, D. Chiang, and J. Chen, 2002 December, “Optimization-based Available-to-Promise Allocation Model,” The 4th Asia-Pacific Conference on Industrial Engineering and Management Systems, Taipei, Taiwan.

061.

D. Chiang, R. Guo and M. Yu, 2002 December, “A Component Commonality-based Material Planning Model for the Assembly Industry,” The 4th Asia-Pacific Conference on Industrial Engineering and Management Systems, Taipei, Taiwan.

062.

D. Chiang, R. Guo and M. Lee, 2002 December, “Using Decomposition Method to Solve Multi-Plant Production Planning and Scheduling Problem,” The 4th Asia-Pacific Conference on Industrial Engineering and Management Systems, Taipei, Taiwan.

063.

J. Liu, D. Chiang, and R. Guo, 2002 December, “Coordinated Multi-plant Production Planning in a Multi-echelon Production Environment,” The 4th Asia-Pacific Conference on Industrial Engineering and Management Systems, Taipei, Taiwan.

064.

C. Fan, R. Guo, A. Chen, A. Hon, J. Wei, and M. King, 2003 October, “Integrated Yield Mining Solution with Enhanced Electrical Test Data Correlation,” International Symposium on Semiconductor Manufacturing, San Jose, CA.

065. Y. Su, R. Guo, and S. Chang, 2004 September, “Inter-firm Collaboration Mechanism in Process Development and Product Design between Foundry and Fabless Design House,” Semiconductor Manufacturing Technology Workshop, Hsinchu, Taiwan.
066. R. Guo, Y. Su, and S. Chang, 2004 September, “Manufacturing and Engineering Collaboration Mechanism between Foundry and Fabless,” International Symposium on Semiconductor Manufacturing, Tokyo, Japan.
067. R. Guo, Y. Su, and S. Chang, 2004 December, “Collaborative Engineering Mechanism between IC Design House and Foundry,” The 5th Asia-Pacific Conference on Industrial Engineering and Management Systems, Gold Coast, Australia.
068. Y. Su, R. Guo, and W. Hsieh, 2004 December, “Research on Business Model of Silicon Intellectual Property Providers,” Technology Management Conference, Taipei, Taiwan.
069. Y. Su, R. Guo, and W. Hsieh, 2004 December, "Patterns of Business Model Shift: A Historical Study on the SIP Providers," Innovation & Management Conference, Taipei, Taiwan.
070. Y. Su, R. Guo, and Y. Chang, 2004 December, “Inter-firm Horizontal Collaboration Model for Total Solution Service Provision: Case Study on the Partnership of SIP Providers in the IC Design Industry,” Innovation & Management Conference, Taipei, Taiwan.
071. Y. Su, R. Guo, and Y. Chang, 2005 June, “Patterns of Horizontal Collaboration for Total Solution Service Provision in the IC Design Industry,” Tenth Annual Meeting of the Asia Pacific Decision Sciences Institute, Taipei , Taiwan .
072. Y. Su, R. Guo, and S. Chang, 2005 July, “Inter-firm Collaboration Mechanism for Process-Product Innovation between Foundry and Fabless Design House,” Portland International Center for Management of Engineering and Technology Conference, Portland , Oregon .
073. Y. Su, R. Guo, and W. Hsieh, 2005 July, “Historically Explore on the Patterns of Business Model for Silicon Intellectual Property Providers in the Semiconductor Industry,” Portland International Center for Management of Engineering and Technology Conference, Portland , Oregon .
074. Y. Su, R. Guo, and C. Hsiao, 2005 September, “Patterns of Vertical Engineering Collaboration between Foundry and Design Service Provider,” International Symposium on Semiconductor Manufacturing, San Jose , CA .
075. D. Chiang, R. Guo, A. Chen, 2005 October, “Robust Supply Chain Configurations in Semiconductor Manufacturing,” International Conference on Modeling and Analysis of Semiconductor Manufacturing, Suntec City , Singapore .
076. R. Guo, D. Chiang, F. Pai, and C. Tsao, 2005 December, “Retailer’s Ordering Policy: The Tradeoff between Emergent Replenishment and Backup Agreement,” The 6th Asia-Pacific Conference on Industrial Engineering and Management Systems, Manila , Philippines .
077. D. Chiang, R. Guo, F. Pai, and K. Chen, 2005 December, “Optimal Ordering Policy by Considering the Tradeoff between Discount Vendor and Emergency Vendor,” The 6th Asia-Pacific Conference on Industrial Engineering and Management Systems, Manila , Philippines .
078. J. Liou, D. Chiang, and R. Guo, 2005 December, “Supply Chain Production Planning Problem with Occupied Material,” The 6th Asia-Pacific Conference on Industrial Engineering and Management Systems, Manila , Philippines .
079. D. Chiang, R. Guo, J. Liou, and H. Lee, 2005 December, “Coordinated Multi-plant Production Planning in a Multi-echelon Production Environment Considering Alternative Route ,” The 6th Asia-Pacific Conference on Industrial Engineering and Management Systems, Manila , Philippines .
080. R. Guo, D. Chiang, K. Chuang, L. Yang, and J. Liou, 2005 December, “Semiconductor Supply Chain Monitoring Schemes for Echelon WIP Inventory,” Chinese Industrial Engineering Conference, Hsinchu, Taiwan.
081. D. Chiang, R. Guo, A. Chen, M. Cheng, C. Chen, and P. Chung, 2005 December, Optimal Supply Chain Configurations in Semiconductor Manufacturing,” Chinese Industrial Engineering Conference, Hsinchu, Taiwan.
082. R. Guo, D. Chiang, L. Yang, and K. Chuang, 2006 September, “Supply Chain Inventory Control in Semiconductor Manufacturing,” International Symposium on Semiconductor Manufacturing, Tokyo , Japan .
083. D. Chiang, R. Guo, A. Chen, and C. Chen, 2006 September, “A Quadratic Goal Programming Model and Sensitivity Analysis for Semiconductor Supply Chain,” International Symposium on Semiconductor Manufacturing, Tokyo , Japan .
084. Y. Su, R. Guo, and H. Chang, 2006 September, “Evolutionary Engineering Collaboration for DFM/DFY Solutions between Foundry and EDA Tools Vendors: A Preliminary Exploration,” International Symposium on Semiconductor Manufacturing, Tokyo , Japan .
085. R. Guo, D. Chiang, H. Lo, and F. Pai, 2006 December, “The Design of Supply Chain Contract in Consideration of Risk Pooling and Risk Sharing,” The 7th Asia-Pacific Conference on Industrial Engineering and Management Systems, Bangkok , Thailand .
086. R. Guo, D. Chiang, and L. Yang, 2006 December, “Monitoring Semiconductor Supply Chain based on Echelon WIP Inventory and CONWIP System,” The 7th Asia-Pacific Conference on Industrial Engineering and Management Systems, Bangkok, Thailand.
087. D. Chiang, R. Guo, M. Chen, and F. Pai, 2006 December, “Take-or-Pay Supply Chain Contract under Market Price Volatility,” The 7th Asia-Pacific Conference on Industrial Engineering and Management Systems, Bangkok , Thailand .
088. D. Chiang, R. Guo, A. Chen, and C. Chen, 2006 December, “Sensitivity Analysis of a Quadratic Goal Programming Model for Semiconductor Supply Chain,” The 7th Asia-Pacific Conference on Industrial Engineering and Management Systems, Bangkok , Thailand .
089. R. Guo, D. Chiang, and L. Yang, 2006 December, “Semiconductor Supply Chain Monitoring Schemes for Echelon WIP Inventory Using CONWIP Concept,” Chinese Industrial Engineering Conference, Tai-Chung, Taiwan.
090. D. Chiang, R. Guo, A. Chen, and C. Chen, 2006 December, “Sensitivity Analysis of a Quadratic Goal Programming Model for Semiconductor Supply Chain,” Chinese Industrial Engineering Conference, Tai-Chung, Taiwan.
091. R. Guo and D. Chiang, 2007 June, “Monitoring and Control of Echelon Inventory in Semiconductor Manufacturing,” International Conference on Operations and Supply Chain Management, Xina, China.
092. F. Pai, D. Chiang, and R. Guo, 2007 August, “Customer Satisfaction Improvement with a Hybrid Dispatching Rule in Semiconductor Back-end Factories,” 2007 Annual meeting of Academy of Management, Philadelphia, Pennsylvania.
093. R. Guo, Y. Su, S. Chiu, F. Pai and C. Yeh, 2007 October, “Evolutionary Business Models and Inter-Firm Engineering Processes between the Foundry and Fabless in the Semiconductor Industry,” International Symposium on Semiconductor Manufacturing, San Jose, CA.
094. R. Guo, D. Chiang, H. Lin, and M. Guo, 2007 October, “Forward Echelon-based Inventory Monitoring in Semiconductor Supply Chain,” International Symposium on Semiconductor Manufacturing, San Jose, CA.
095. R. Guo, D. Chiang, Y. Chen, and J. Chen, 2007 December, “Stochastic Modeling and Validation of Inter-purchase Time for Customer Relationship Management,” The 8th Asia-Pacific Conference on Industrial Engineering and Management Systems, Kaohsiung, Taiwan.
096. R. Guo, Y. Su, S. Chiu, and F. Pai, 2007 December, “Inter-firm Engineering Processes and Business Models between Foundry and Fabless in Semiconductor Industry,” The 8th Asia-Pacific Conference on Industrial Engineering and Management Systems, Kaohsiung, Taiwan.
097. F. Pai, R. Guo, and D. Chiang, 2007 December, “Cooperative Buyer-Vendor Relationships for Custom Integrated Circuits Manufacturing,” The 8th Asia-Pacific Conference on Industrial Engineering and Management Systems, Kaohsiung, Taiwan.

C. Books

001. Production and Operations Management, 1997 October, Open University of Taiwan
002. Chapter 17 & 19 in Run-to-Run Control in Semiconductor Manufacturing, 2000 OctoberCRC Press
003. Production and Operations Management Cases, 2002 October, Yuan-Liou Publishing

Last Update :  2008/12/16